Projects > Featured Projects > Topaz House Apartments

Topaz House Apartments

The entrance lobby of the luxury 11 story, 363 unit, Topaz House Apartments had not been renovated since the building was first opened in 1966. The entry had a textured asbestos sprayed ceiling with surface mounted light fixtures. The marble floor was in good condition, but had been worn to a dull finish. Abramson Construction Corporation worked with the building's management team to phase the renovation to allow for the removal of the asbestos and reconstruct the lobby's interior using an Empress Green marble for the column cover and floor accents and stained cherry paneling to update the lobby to modern luxury standards.

Before
After
Before
After

Abramson Construction Corporation personnel followed up on the lobby renovation with refinishing the entrance doors, carpet and wall coverings on the typical floors and then constructing an exercise facility for the tenants.

Before
After